Bridge Photos

View Pond Videos

All pipes and culverts that the divers could enter for inspection were videoed.  The videos are posted here and can be viewed with any video player that supports the AVI format.  The title of each clip refers to the the lake number or structure number (control structure,CS, or catch basin,CB) that a pipe starts and ends in.  L17 to L5 refers to a pipe starting in lake 17 and ending in lake 5.  Refer to this map for locations (see bottom of map for details) or the dive report in Appendix E of the KH Condition Report.

Shenandoah Dive Report V5

Seven Example Videos